This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: October 17, 2005
Proposal by Wambo Power Ventures Pty Ltd (WPV) to construct and operate a 320 megawatt (MW) continuous base load, combined cycle gas turbine (CCGT) power station situated in Kwinana. Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: August 5, 2002
AGR is a joint venture between Wesfarmers CSBP Limited and Coogee Chemicals Pty Ltd which was formed to manufacture and market sodium cyanide. The AGR facility is located at Wesfarmers CSBP's fertiliser and chemicals complex in Kwinana (Figure 1). It currently operates two liquid sodium cyanide plants which have a combined production capacity of 50,000 tonnes per annum (tpa) of pure (100 percent) sodium cyanide, with the potential to expand to 70,000 tpa. These plants produce sodium... Read more...Last updated: July 22, 1999
Saracen Properties Pty Ltd propose to construct and operate a brick and tile manufacturing plant in Hazelmere, south of the Midland town center, approximately 16 km north-east of the Perth metropolitan area. Read more...Last updated: September 28, 1995
Tiwest Joint Venture proposes to increase the production of finished titanium dioxide pigment at its Kwinana Pigment Plant from 64,000 to 80,000 tonnes per annum by undertaking a "debottlenecking" process. Read more...