This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: September 27, 2024
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...Last updated: October 4, 2012
Request to change implementation conditions of Ministerial Statement 126 . Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: December 4, 2006
Iluka Resources Ltd (Iluka) has sought to update the 1992 Ministerial Statement 291 to reflect the current operating parameters and licence conditions at the North Capel Synthetic Rutile Plants 1 and 2 site via a review of the conditions and commitments in that Ministerial statement. Accordingly, the Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice to him under Section 46(6) of the, Environmental Protection Act 1986 Read more...Last updated: October 5, 2005
CSBP Limited propose to remediate the former Cresco site in Bayswater. There is up to 280,000 m 3 of contaminated soil present on site. The contamination was caused by the disposal of pyritic wastes or cinders, lead chamber washings, sodium bisulphate, den-scrubber effluent, superphosphate and other building wastes during the site’s history. The cinders, sodium bisulphate and den-scrubber effluent were deposited in excavated pits while the other wastes were disposed of on a more random basis.... Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...Last updated: July 22, 1999
Saracen Properties Pty Ltd propose to construct and operate a brick and tile manufacturing plant in Hazelmere, south of the Midland town center, approximately 16 km north-east of the Perth metropolitan area. Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: May 19, 1997
The proposal is to to expand NufarmCoogee Pty Ltd's Chlor-alkali Plant at Kwinana to allow an increase in chlorine gas production to 42,000 tonnes per annum (tpa) through the installation of a new electrolysis processing circuit. Storage of chlorine held on site will rise from a nominal 50 tonnes to 150 tonnes. Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...Last updated: March 15, 1996
The proposal is to establish an export abattoir at Narrikup, 20km north of Albany. Read more...Last updated: November 1, 1991
Proposal to establish a cereal straw and waste paper pulp and paper mill near Moora in the Central Midlands district of Western Australia. Read more...Last updated: September 12, 1991
Deras (Australia) Pty Ltd (Deras) proposes to establish and operate a 'wet-blue' tannery within the Shire of West Arthur, approximately 14 km north-east of Darkan. The facility would tan up to 220,000 cattle hides per annum using conventional tanning procedures. Hides would be mainly purchased from abattoirs in the south-west. The site would include a receival yard, a parking area, process building (including storage and office areas), a water reservoir and a wastewater treatment and... Read more...