This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 2, 2025
The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...