This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 28, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: July 29, 2019
The proposal is to develop and operate a mineral sands mine approximately 25 kilometres south-east of the township of Dongara in the Midwest Region of Western Australia. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: October 22, 2012
To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...Last updated: May 22, 2012
The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...