This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: February 18, 2019
The proponent has requested consideration be given to removal of condition 9, which is the spider monitoring program. The Minister noted, that during the assessment of the proposal, offsets were proposed by the proponent but were not conditioned in Ministerial Statement 805. As part of this inquiry, the Minister requested that consideration is given to the application of offsets to the proposal and whether they should be included as a condition. Read more...Last updated: July 27, 2017
Tungsten Mining NL proposes to extract and process tungsten and molybdenum from the Mulgine Hill and Mulgine Trench deposits at Mount Mulgine over a period of 15 years. The proposal is located approximately 15 km north east of Rothsay, within the Shire of Perenjori. The proposal is partially located: on M59/425, which was previously mined for gold as part of the Minjar Gold Mine Project within the former Warriedar pastoral station, which is managed for conservation purposes by the Department of... Read more...Last updated: May 22, 2017
In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...Last updated: January 12, 2017
Three Springs Solar Pty Ltd is proposing to construct and operate a 100MW solar photovoltaic power station on Lots M761-M764 and Lot 50 Bruce Road, approximately 2km north east of the Three Springs Townsite. The sites are predominately cleared farm land and no vegetation clearing is proposed. Read more...Last updated: April 22, 2013
Minjar Gold Pty Ltd project involves varying the current status of the mine from Care and Maintenance to Operating, expanding a series of existing pits, developing new deposits and making a small addition to the accommodation facilities. The project has an established Carbon in Leach processing facility and tailings storage facility and existing approvals to operate (Works Approval and approved Mining Proposals). Minjar Gold plans to produce gold from a chain of open pits extending over a 50 km... Read more...Last updated: October 18, 2012
The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah. Read more...