This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...