Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter
  • Iron Ore (1) Apply Iron Ore filter
  • Power generation (1) Apply Power generation filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter

Filter by current status:

  • (-) Remove Assessment on Proponent Information – public submission period closed filter Assessment on Proponent Information – public submission period closed

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (5) Apply Flora and Vegetation filter
  • Social Surroundings (5) Apply Social Surroundings filter
  • Inland Waters (4) Apply Inland Waters filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • 3144 (1) Apply 3144 filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (1) Apply BHP Iron Ore Pty Ltd filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Infinite Green Energy Limited (1) Apply Infinite Green Energy Limited filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter

Filter by region:

  • Pilbara (2) Apply Pilbara filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter
  • Mid West (1) Apply Mid West filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2021 (1) Apply 2021 filter
  1. Home
  2. Proposal search
  3. Terrestrial Fauna
  4. Assessment on Proponent Information – public submission period closed

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Arrowsmith Hydrogen Project

Last updated: April 13, 2025

Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...

Jimblebar Hub Significant Amendment

Last updated: March 24, 2025

The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...

Telfer - Havieron Gold Mining Project

Last updated: December 5, 2024

Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station,... Read more...

North Kiaka Quartzite Mine

Last updated: April 24, 2024

Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...

Munglinup Graphite Project

Last updated: May 10, 2021

The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.