Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (6) Apply Infrastructure filter
  • Land use (3) Apply Land use filter
  • Mineral sands (2) Apply Mineral sands filter
  • Power generation (2) Apply Power generation filter
  • Coal (1) Apply Coal filter
  • Industrial (1) Apply Industrial filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter

Filter by current status:

  • Ministerial Statement published (9) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Inland Waters Environmental Quality (13) Apply Inland Waters Environmental Quality filter
  • Flora and Vegetation (12) Apply Flora and Vegetation filter
  • Social Surroundings (9) Apply Social Surroundings filter
  • Terrestrial Fauna (8) Apply Terrestrial Fauna filter
  • 37 (7) Apply 37 filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Human Health (1) Apply Human Health filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Alcoa World Alumina Australia (1) Apply Alcoa World Alumina Australia filter
  • BHP Titanium Minerals (1) Apply BHP Titanium Minerals filter
  • Bunbury Port Authority (1) Apply Bunbury Port Authority filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • Canal Rocks Pty Ltd (1) Apply Canal Rocks Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Kemerton Silica Sand Pty Ltd (1) Apply Kemerton Silica Sand Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Transfield Services Kemerton Pty Limited (1) Apply Transfield Services Kemerton Pty Limited filter
  • Vasse Coal Management Pty Ltd (1) Apply Vasse Coal Management Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter
  • Wesfarmers Energy Limited (1) Apply Wesfarmers Energy Limited filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • (-) Remove South West filter South West
  • Peel (1) Apply Peel filter

Filter by last updated:

  • 2024 (1) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (2) Apply 2016 filter
  • 2014 (2) Apply 2014 filter
  • 2013 (1) Apply 2013 filter
  • 2011 (2) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2007 (2) Apply 2007 filter
  • 2005 (1) Apply 2005 filter
  1. Home
  2. Proposal search
  3. Terrestrial Environmental Quality
  4. South West
  5. Hydrological Processes

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production

Last updated: May 16, 2023

Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...

Wagerup Alumina Refinery - Increase in Production to 4.7 Mtpa; and Wagerup Cogeneration Plant

Last updated: October 15, 2018

Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...

Busselton Eastern Link Project

Last updated: April 9, 2018

City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...

Extension of Kemerton Silica Sand Dredge Mining (s46)

Last updated: November 13, 2017

Read more...

Vasse Coal Project

Last updated: December 7, 2016

Read more...

Bunbury Port Inner Harbour Structure Plan

Last updated: November 22, 2016

The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...

Heavy Mineral Sands Mine, Beenup, Shire of Augusta-Margaret River (s46) [986]

Last updated: August 28, 2014

The proposal is to rehabilitate the Beenup Titanium Minerals Project Area located 17km north-east of Augusta in the Shire of Augusta-Margaret River. The Beenup Rehabilitation Project is located on retained portions of Mining Leases 70/574 and 70/575. Inquiry under s46 to amend Ministerial Statement 140 . Read more...

Bunbury Berth 14A Expansion Project

Last updated: June 18, 2014

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Proposed Forest Management Plan 2014 - 2023

Last updated: November 21, 2013

Read more...

Gwindinup Mineral Sands Mine

Last updated: November 24, 2011

The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...

South West Yarragadee Water Supply Development

Last updated: March 10, 2011

The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...

Smiths Beach Development, Sussex Location 413 Yallingup

Last updated: June 15, 2010

The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...

Perth – Bunbury Highway (Peel Deviation)

Last updated: September 24, 2007

The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...

Kemerton Power Station Enhancement Project

Last updated: August 9, 2007

The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...

Collie Power Station Expansion

Last updated: June 13, 2005

Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.