This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: October 29, 1999
Proposal to redevelop the Harvey and Stirling Reservoir system in order to divert an additional quantity of water from the Harvey Basin for the Perth Metropolitan Water Supply Scheme (PMWSS). The proposal involves the construction of a new pipeline from Harris Sam to Stirling Reservoir to enable transfer of water. Read more...Last updated: January 19, 1998
The proposal is to construct and operate a barge loading facility south of Mowbowra Creek in the Shire of Exmouth for the export of limestone proposed to be mined from the nearby Whitecrest Limestone Mine. The proponent has indicated that a future proposal to develop a larger shipping facility, including a dredged shipping approach, is envisaged. Such a proposal is not considered as part of this assessment, and will require further environmental impact assessment at a later stage should the... Read more...Last updated: October 13, 1997
The proposal is to extend the Exmouth water supply borefield, and includes: extending the existing borefield, to the west (equipping existing bores) and to the south (drilling and equipping new bores); increasing the long term supply capacity from approximately 760 million litres per year (ML!yr) to 1,025ML!yr; constructing four dedicated stygofauna monitoring bores (two within the proposed borefield extension and two to the south of Shothole Canyon Road, which has been identified as future... Read more...