Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Iron Ore filter Iron Ore
  • Infrastructure (3) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (17) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (4) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - appeals closed (2) Apply EPA Report and Recommendations released - appeals closed filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter

Filter by relevant environmental factors:

  • (-) Remove Landforms filter Landforms
  • Flora and Vegetation (24) Apply Flora and Vegetation filter
  • Terrestrial Fauna (20) Apply Terrestrial Fauna filter
  • Social Surroundings (14) Apply Social Surroundings filter
  • Subterranean Fauna (9) Apply Subterranean Fauna filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Inland Waters (6) Apply Inland Waters filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • 37 (2) Apply 37 filter
  • 3144 (2) Apply 3144 filter
  • Greenhouse Gas Emissions (2) Apply Greenhouse Gas Emissions filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (2) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Karara Mining Limited (2) Apply Karara Mining Limited filter
  • Polaris Metals Pty Ltd (2) Apply Polaris Metals Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (2) Apply Robe River Mining Co. Pty. Ltd filter
  • Robe River Mining Company Pty Ltd (2) Apply Robe River Mining Company Pty Ltd filter
  • Yilgarn Iron Pty Ltd (2) Apply Yilgarn Iron Pty Ltd filter
  • BHP Iron Ore (Jimblebar) Pty Ltd (1) Apply BHP Iron Ore (Jimblebar) Pty Ltd filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • Chichester Metals Pty Ltd (1) Apply Chichester Metals Pty Ltd filter
  • Crosslands Resources Ltd (1) Apply Crosslands Resources Ltd filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Hermitage Holdings Pty Ltd; Devereux Nominees Pty Ltd (1) Apply Hermitage Holdings Pty Ltd; Devereux Nominees Pty Ltd filter
  • Mineral Resources Limited (1) Apply Mineral Resources Limited filter
  • Murchison Metals Ltd (1) Apply Murchison Metals Ltd filter
  • Paloma Holdings Pty Ltd (1) Apply Paloma Holdings Pty Ltd filter
  • Pinecroft Pty Ltd (1) Apply Pinecroft Pty Ltd filter
  • Rhodes Ridge Management Services Pty Ltd (1) Apply Rhodes Ridge Management Services Pty Ltd filter
  • Sinosteel Midwest Corporation Limited (1) Apply Sinosteel Midwest Corporation Limited filter
  • Terra Mining Pty Ltd (1) Apply Terra Mining Pty Ltd filter
  • Westralian Iron Pty Ltd (1) Apply Westralian Iron Pty Ltd filter

Filter by region:

  • Pilbara (12) Apply Pilbara filter
  • Mid West (9) Apply Mid West filter
  • Goldfields Esperance (4) Apply Goldfields Esperance filter
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (1) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2017 (3) Apply 2017 filter
  • 2016 (3) Apply 2016 filter
  • 2015 (4) Apply 2015 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2009 (1) Apply 2009 filter
  • 2008 (1) Apply 2008 filter
  • 2000 (1) Apply 2000 filter
  • 1997 (1) Apply 1997 filter
  1. Home
  2. Proposal search
  3. Landforms
  4. Iron Ore

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Robe Valley Iron Ore Mine

Last updated: April 7, 2025

Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...

Mindy South Iron Ore Mine

Last updated: March 7, 2025

Chichester Metals Pty Ltd is proposing to construct and operate an iron ore mine approximately 55 km north-west of Newman, and 30 km south of Fortescue’s existing Nyidinghu project in the Pilbara region. The proposal would require a disturbance footprint of 12,487 ha and is located within a 42,331 ha mine development envelope. The proposal is located within the Nyiyaparli and Nyiyaparli #3 Native Title determination area (WCD 2018/008) The proposal includes both above and below water table open... Read more...

Rhodes Ridge Iron Ore Project

Last updated: November 4, 2024

The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...

Karara Iron Ore Project – Mine Life Extension

Last updated: October 16, 2023

Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...

Marillana Iron Ore Project, Shire of East Pilbara (S46) [2352]

Last updated: October 31, 2022

The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...

Balla Balla Magnetite Mining Project (S46) [2224]

Last updated: May 27, 2020

Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...

Koolyanobbing Range F Deposit (s46) [2198]

Last updated: May 6, 2020

Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...

Mesa A Hub Revised Proposal

Last updated: August 21, 2019

Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...

Windarling range; Mt Jackson Range and Deception Deposit (S46) [2199]

Last updated: April 1, 2019

Changes to condition 7 (Restricted areas and management of Tetratheco paynteroe ssp. paynterae at the Windarling Range) to allow future ground disturbing access to the restricted 'Area B', and condition 10 (Residual impacts and risk management measures) in terms of revised research and management offset measures for threatened flora species. Read more...

Karara Iron Ore Project

Last updated: December 13, 2017

The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...

Koolanooka South Magnetite Project

Last updated: March 22, 2017

Westralian Iron Pty Ltd proposes to develop three bulk sample pits at Koolanooka South (Figure 1). The project site is located approximately 20 kilometres (km) due east of Morawa and 370 km north of Perth. Bulk sampling is required to assist with future planning and design for the proposed development and to provide sufficient material for a test regime to fully understand the characteristics of the ore to enable an efficient Magnetite processing plant to be designed. The bulk sampling... Read more...

Yilgarn Operations, Koolyanobbing Range F Deposit

Last updated: January 25, 2017

The proponent proposes to extend its existing Yilgarn mining operations to include the Koolyanobbing Range F Deposit (the proposal), located on the southern Koolyanobbing Range, approximately 50 kilometres (km) north-east of the town of Southern Cross. Read more...

Mount Gibson Range Mine Operations - Iron Hill Deposits

Last updated: December 5, 2016

The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...

Blue Hills Mungada East Expansion (1)

Last updated: November 21, 2016

Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. Read more...

Marillana Creek (Yandi) Life of Mine Proposal, Mining Leases 270SA and 47/292, 90 km north-west of Newman

Last updated: May 4, 2016

Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...

Orebody 18 Iron Ore Mine (s. 46)

Last updated: August 7, 2015

The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...

Exploration drilling - Feral Prospect

Last updated: August 4, 2015

The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...

Jackson 4 (J4) Iron Ore Mine and Haul Road on M77/1242, L77/250, L77/252 and L77/25

Last updated: February 20, 2015

The proposal is to develop the Jackson 4 (J4) deposit and construct and operate an iron ore mine and supporting infrastructure, access track and haul road in the Goldfields region of Western Australia, approximately 60 kilometres north-west of Koolyanobbing. Read more...

Jackson 5 and Bungalbin East Iron Ore Project [2031A]

Last updated: January 12, 2015

The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted this proposal back to the EPA for assessment at the level of Public Environmental Review (8 weeks). Access the re-assessment of this proposal here. Read more...

Mesa A / Warramboo Iron Ore Project

Last updated: March 27, 2013

The proposal is to mine iron ore at Mesa A / Warramboo in the Robe Valley, Pilbara. The proposal involves the development of mine pits at Mesa A and Warramboo; a primary sizer processing plant; associated mine infrastructure; and the construction of a rail line to link into existing Mesa J mining operations., Note:, Also see Mesa A / Warramboo Iron Ore Project (s43) Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.