This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 14, 2024
Perpetual Resources Limited propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 300 km north of Perth. The proposal would include a total disturbance of 590 hectares of native vegetation and will involve sequential mining of sand above the water table. 100 ha will be cleared within the first two years followed by annual clearing of 20 ha cells and progressive rehabilitation of mined cells. Vegetation and topsoil will be stockpiled for... Read more...Last updated: September 13, 2024
The Shire of Serpentine Jarrahdale proposes to extract gravel from a twelve hectare area known as the Scrivener Road Gravel Reserves. The reserves are located at the top of the scarp south of Serpentine and contain nesting habitat for all three protected black cockatoo species. Extraction is proposed in two hectare stages over a period of thirteen years. Read more...Last updated: June 25, 2024
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...Last updated: May 27, 2024
The proponent (VRX Silica Ltd) proposes to develop a high-grade silica sand mine in the Geraldton Sandplain bioregion of WA, approximately 260 km north of Perth and 20km North-West of Eneabba. The proposal would include a total disturbance of 334 hectares of native vegetation. Vegetation and topsoil would be relocated to rehabilitation areas using a Vegetation Direct Transfer method (VDT). Mining is proposed to occur in blocks (150m x 150m), with up to five blocks being mined each year. The... Read more...Last updated: April 24, 2024
Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...