This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 22, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: October 16, 2023
Water Corporation propose to conduct a 6- month water source abstraction trial to assess the long-term viability of a new water source for Walpole, Western Australia. The trial will be conducted during the summer peak water demand period and will use existing infrastructure. The source comprises three existing deep fractured rock bores located within the following Water Corporation Lots: • Bore 5/09 is located within the Swan Road road reserve • Bore 3/20 is located within part of Lot on Plan... Read more...Last updated: August 14, 2023
Horizon Power is proposing to construct common user transmission infrastructure to enable the supply of grid electricity to the Burrup Strategic Industrial Area (SIA). The Proposal includes construction of an approximately 7 km long, 132 kV overhead transmission line between the Dampier substation and the Burrup SIA, clearing of unsealed access tracks along the transmission line route, an extension of the existing Dampier substation (inclusive of 132 kV switchgear, fencing and ancillary... Read more...Last updated: July 3, 2023
The proposal is to construct and operate an extension to the Dampier Cargo Wharf at the Port of Dampier. The proposal incorporates the construction of a new (adjoining) southern section of wharf and associated mooring dolphin, dredged berth pocket and vessel manoeuvring area. The Proposal will enable larger vessels (up to Panamax class) to access the terminal and facilitate new trades and products being handled at the Port. Key construction elements of the Project include dredging, blasting,... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 11, 2023
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...Last updated: March 27, 2023
Red Moon Property Holdings Pty Ltd and property lessee Altera Ltd propose to construct and operate Carpenter’s dam taking water from 4-mile brook. The proposal is to construct a dam not exceeding 3,400,000 cubic metres in capacity which includes an automatic bypass system that allows at least 8, 000 kilolitres of water to bypass the dam with excess water returned to the original watercourse. The proposal is in Beedelup, WA, approximately 20 kilometres Southwest of Manjimup, adjacent to the... Read more...