This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: November 21, 2019
The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...Last updated: August 14, 2019
Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: March 6, 2019
Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...Last updated: March 5, 2019
Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure. The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...Last updated: February 4, 2019
The Shire of Ashburton is proposing the development of a new regional waste management facility located on undeveloped land at 150 Onslow Road, Talandji, approximately 36 km south of Onslow. The Pilbara Waste Management Facility will provide a range of waste management services including sustainable initiatives such as material reuse, recycling and recovery as well as treatment and disposal. The facility will include: - Class IV Landfill; - Bulk Waste Area including: Green... Read more...