Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (7) Apply Iron Ore filter
  • Land use (2) Apply Land use filter
  • Oil and gas (1) Apply Oil and gas filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (13) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (6) Apply Decision on whether to assess has been published filter

Filter by relevant environmental factors:

  • Flora and Vegetation (12) Apply Flora and Vegetation filter
  • Terrestrial Fauna (10) Apply Terrestrial Fauna filter
  • Hydrological Processes (7) Apply Hydrological Processes filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • 37 (3) Apply 37 filter
  • Social Surroundings (3) Apply Social Surroundings filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Human Health (2) Apply Human Health filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Coastal Processes (1) Apply Coastal Processes filter

Filter by Proponent:

  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Brockman Iron Pty Ltd (1) Apply Brockman Iron Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Department of Treasury - Strategic Projects (1) Apply Department of Treasury - Strategic Projects filter
  • Esperance Port Sea and Land (1) Apply Esperance Port Sea and Land filter
  • Golden West Resources Ltd (1) Apply Golden West Resources Ltd filter
  • Hamersley Hope Management Services Pty Ltd (1) Apply Hamersley Hope Management Services Pty Ltd filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Mermaid Marine Australia Ltd (1) Apply Mermaid Marine Australia Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • PIOP Mine Co NL (1) Apply PIOP Mine Co NL filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Public Transport Authority of Western Australia (1) Apply Public Transport Authority of Western Australia filter
  • Tallwood Nominees Pty Ltd (1) Apply Tallwood Nominees Pty Ltd filter
  • The Minister for State Development (1) Apply The Minister for State Development filter
  • Water Corporation (1) Apply Water Corporation filter
  • Western Power (1) Apply Western Power filter

Filter by region:

  • Pilbara (9) Apply Pilbara filter
  • Perth (4) Apply Perth filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Mid West (2) Apply Mid West filter
  • South West (2) Apply South West filter
  • Kimberley (1) Apply Kimberley filter

Filter by last updated:

  • (-) Remove 2013 filter 2013
  1. Home
  2. Proposal search
  3. 2013
  4. Infrastructure

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Electrical Distribution Transformers - Noise Regulation 17 Variation

Last updated: November 25, 2013

On 21 September 2011, Western Power, through the Minster for Energy, applied to the Minister for Environment for an approval under noise regulation 17 in relation to Western Power’s existing and future electrical distribution transformers. The basis of the application was that the noise emissions from a large number of distribution transformers operated by Western Power do not comply with the assigned noise levels specified by the noise regulations, due to their proximity to noise sensitive... Read more...

Swan River Pedestrian Bridge Linking the East Perth Foreshore to the Burswood Peninsula

Last updated: November 18, 2013

The Public Transport Authority of Western Australia proposes to develop a pedestrian bridge over the Swan River linking the East Perth foreshore to the Burswood Peninsula and the construction of a bus hub at East Perth. The proposal forms the third component (Part 3) of the new Perth Stadium Project, Part 1 being the construction of the Stadium and associated Sports Precinct, and Part 2 being the construction of the Transport Corridor Infrastructure including rail works and upgrades to the... Read more...

South West Creek Dredging and Reclamation Proposal

Last updated: November 8, 2013

The proposal involves the dredging of not more than 14.2 million cubic metres (Mm 3 ) of material for eight new berth pockets, a turning circle and a link to the existing shipping channel. The proposal also involves the construction of two new land based dredge management areas (DMMAs). Dredged material will be disposed offshore at an existing disposal ground in Commonwealth waters and the new and existing DMMAs. Read more...

Hope Downs Iron Ore Mine

Last updated: November 7, 2013

To establish an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Ularring Hematite Project

Last updated: October 24, 2013

The proposal is to develop an iron ore mine and associated infrastructure in the Goldfields region, 450 kilometres (km) east-north-east of Perth. The proposal includes a borefield and adjoining water pipeline 60km west of the mine site and a rail siding 130km east of the mine site and 8km south of Menzies. Read more...

Port Geographe - Stage 1 (s46)

Last updated: September 13, 2013

The proposal is for the development of a 300 hectare site at Port Geographe, including a main harbour with mooring and public boat launching facilities, a waterway residential subdivision with canal and ordinary residential blocks, holiday accommodation, public open space and an estuary conservation zone. Inquiry under s46 regarding a requested change to environmental conditions of Ministerial Statement 89 . Read more...

Perth Groundwater Replenishment Scheme

Last updated: September 2, 2013

Water Corporation is proposing to implement a 14 gigalitre per annum groundwater replenishment scheme (GWRS) of recycled wastewater to the Leederville and Yarragadee aquifers, located on the Swan Coastal Plain. Read more...

Western Turner Syncline Stage 2 – B1 and Section 17 Deposits

Last updated: August 22, 2013

The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Western Turner Syncline Stage 2 – B1 and Section 17 deposits, located approximately 30 kilometres west of Tom Price in the central Pilbara Region, Western Australia. Read more...

Port of Esperance Maintenance Dredging

Last updated: August 5, 2013

Esperance Port Sea and Land proposes to undertake maintenance dredging in the Port of Esperance to return the bathymetry to design depth, with disposal of most sediments to an offshore disposal site and some sediments to an onshore disposal area. Read more...

Gorgon Gas Development Barrow Island Nature Reserve

Last updated: June 26, 2013

Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...

Ord River Irrigation Area Stage 2 (M2 supply channel) (s. 46) [1941]

Last updated: June 12, 2013

Inquiry under s46 - request to to amend Ministerial Statement 830 to contemporise and rationalise existing conditions. Read more...

Wiluna West Iron Ore Mining Operation

Last updated: April 22, 2013

Read more...

Upgrade of Marine Service Facilities, King Bay, Dampier

Last updated: February 26, 2013

Proposal by Mermaid Marine Australia Ltd to upgrade the marine services facilities at the marine supply base in King Bay, Dampier. Proposal involves upgrading of existing facilities to service marine vessels and provide a protected anchorage to allow safe berthing, cargo handling, maintenance and shelter from extreme weather events. Read more...

Bunbury Outer Ring Road Stage 2 - Southern Section - South Western Highway to Bussell Highway

Last updated: February 25, 2013

Main Roads Western Australia proposes to construct the Bunbury Outer Ring Road Southern Section (South Western Highway to Bussell Highway) at Bunbury. The project will provide improved access from Bussell Highway in the south, to the Bunbury Port and developing industrial area to the east of Bunbury. Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Hope Downs 4 Iron Ore Project (s. 46)

Last updated: January 30, 2013

The proposal is to construct and operate an iron ore mining area and associated infrastructure at the Hope Downs 4 Iron Ore Mine located approximately 30 kilometres north-west of Newman within the Shire of East Pilbara. Inquiry under s46 - request to change conditions 5-1, 8-2, 8-3, 9 and 10-2 of Ministerial Statement 854 . Read more...

Oakajee Deepwater Port (s. 46) [1950]

Last updated: January 22, 2013

The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...

Brockman Railway Infrastructure Project

Last updated: January 11, 2013

Brockman Iron Pty Ltd is proposing to construct a railway line and associated infrastructure in the Hamersley Iron province in the Pilbara region of Western Australia, approximately 100 kilometres (km) north west of Newman. The railway line would be approximately 79 km in length. The proposal will connect the previously approved Brockman Marillana Iron Ore Project ( Ministerial Statement 855 ) to the existing Fortescue Metals Group (FMG) railway line. Read more...

New Perth Stadium Project

Last updated: January 11, 2013

The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...

Flinders Pilbara Iron Ore Project – Stage 1

Last updated: January 11, 2013

The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.