This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 10, 2012
The proposal is for the marine component of the Perth Wave Energy Project (PWEP) which involves the installation of five 11 metre diameter CETO (Carnegie's wave energy technology) units 3km south west of Garden Island and laying two pipelines to transfer the energy harnessed by the CETO units to an onshore power generation facility located on Garden Island. Read more...Last updated: September 17, 2012
The proposal is to construct infill sewerage infrastructure within an existing built-up area in the location of Ravenswood. The new infrastructure would service 54 residences that are currently utilising septic tanks and leach drains and are all situated in close proximity to the Murray River. The key components of the proposal involve: construction of approximately 1.3 km of dual pressure 100 mm diameter sewer pipelines and 1.5 km of gravity sewer pipeline; construction of a 'Type 1 0... Read more...Last updated: July 16, 2012
The proposal referred to the EPA and to which this advice applies is for Landcorp's Stormwater and Drainage Management Plan for Cockburn Central Stage 2. Stormwater management for Cockburn Central Stage 2 is proposed on Lot 9504 Beeliar Drive, which is adjacent to the main development site of Cockburn Central and contains a Resource Enhancement Wetland (REW) that is also a lake listed under the Environmental Protection (Swan Coastal Plain Lakes) Policy 1992. Read more...