This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 21, 2023
The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...Last updated: November 14, 2023
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: July 8, 2019
The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. Read more...Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...Last updated: August 6, 2003
The proposal is for a poultry litter fired power station at a site approximately 70 kilometres north of Perth on the Brand Highway near Muchea. The power station would receive poultry litter from farms across the broad Perth region. Delivery would be by covered trucks, which would enter the enclosed litter reception shed and tip onto a concrete floor. A front-end loader would be used to place the litter on to a conveyor which would place it on the stockpile. The trucks would be washed down... Read more...Last updated: March 13, 2001
Inquiry under section 46 of the, Environmental Protection Act 1986, to change conditions of Ministerial Statement 481 published on 13 July 1998 to allow increased nitrogen oxides emissions Read more...Last updated: January 24, 2001
The proposal is for a regional waste processing facility within the Kwinana Heavy Industrial Estate. The site is located on the Swan Coastal Plain approximately 30 kilometres south west of the Perth Central Business District and 3 kilometres north-west of the Town of Kwinana. The site is a large undeveloped piece of land which is adjacent to the British Petroleum (BP) refinery. The nearest residences are located to the north east in Hope Valley (approximately 2.6 kilometres) and to the east in... Read more...