Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas
  • Infrastructure (1) Apply Infrastructure filter

Filter by current status:

  • (-) Remove Decision on whether to assess has been published filter Decision on whether to assess has been published

Filter by relevant environmental factors:

  • 3144 (5) Apply 3144 filter
  • Flora and Vegetation (1) Apply Flora and Vegetation filter
  • Inland Waters (1) Apply Inland Waters filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • DBNGP (WA) Nominees Pty Ltd (2) Apply DBNGP (WA) Nominees Pty Ltd filter
  • AGI Operations Pty Limited (1) Apply AGI Operations Pty Limited filter
  • Energy Resources Ltd (1) Apply Energy Resources Ltd filter
  • MEPAU Perth Basin Pty Ltd (1) Apply MEPAU Perth Basin Pty Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • Pilbara (4) Apply Pilbara filter
  • Mid West (3) Apply Mid West filter
  • Perth (1) Apply Perth filter

Filter by last updated:

  • (-) Remove 2024 filter 2024
  1. Home
  2. Proposal search
  3. Oil and gas
  4. Decision on whether to assess has been published
  5. 2024

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

West Erregulla Processing Plant and Pipeline (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Wheatstone Development – Gas Processing, Export Facilities and Infrastructure (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Pluto Liquified Natural Gas Development (Site B Option) Burrup Peninsula (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Waitsia Gas Project Stage 2 (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Perdaman Lateral Project

Last updated: October 14, 2024

The Proposal occurs approximately 20 kilometres north of Karratha within an existing industrial area designated as a service corridor within the Burrup Strategic Industrial Area of the Burrup Peninsula. The Project involves the construction of a 550 meter pipeline and associated supporting infrastructure to transport a maximum of 150 TJ of natural gas per day from the Dampier to Bunbury Natural Gas Pipeline to the proposed Perdaman Urea Plant development. The key components of the Proposal... Read more...

Dampier to Bunbury Natural Gas Pipeline Southern Looping Project, Loop 10, South of Kwinana (S46) [2449]

Last updated: June 4, 2024

Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Read more...

Lockyer Conventional Gas Project

Last updated: April 29, 2024

Energy Resources Ltd proposes a conventional gas project, to construct and operate a gas processing plant and pipeline in the Mid-West region of Western Australia, approximately 350 km north of Perth, 25 km east of Dongara and 15 km west of Mingenew. The proposal comprises the construction and operation of a natural gas processing facility with a nominal production capacity of 250 terajoules per day, up to six (6) natural gas production wellheads, and an infield gathering system and... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.