This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
The proposal is the construction and operation of an open cut gold mine and associated infrastructure, located approximately 330 km east-north-east of Kalgoorlie and 200 km east of Laverton. Read more...Last updated: April 26, 2024
The proposal is to continue to operate the existing Newmont Boddington Goldmine and associated infrastructure, and to expand the existing operations through widening and deepening of existing pits, and through construction of new waste dumps, residue disposal areas and associated infrastructure. Read more...Last updated: April 19, 2024
St Ives Gold Mining Company Pty Limited proposes to expand the existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located in Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie). The revised proposal would include an additional disturbance of 5000 ha: additional lake-based disturbance of up to 2,000 ha; and additional land-based disturbance of up to 3,000 ha. Read more...Last updated: February 23, 2024
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...