This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 13, 2005
Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...Last updated: August 6, 2003
The proposal is for a poultry litter fired power station at a site approximately 70 kilometres north of Perth on the Brand Highway near Muchea. The power station would receive poultry litter from farms across the broad Perth region. Delivery would be by covered trucks, which would enter the enclosed litter reception shed and tip onto a concrete floor. A front-end loader would be used to place the litter on to a conveyor which would place it on the stockpile. The trucks would be washed down... Read more...Last updated: May 23, 2003
The proposal is for the construction, operation, and maintainance of a natural gas fired combined cycle gas turbine (CCGT) power plant with a nominal generation capacity of 120 megawatts (MW) on a site located at Part Lot 131 Mason Road, on the southwestern corner of Donaldson Road and Burton Place, off Mason Road, Kwinana. The plant will provide approximately 1,045 gigawatt hours (GWhr) of electricity annually into the South West Interconnected System (SWIS) electricity market. Read more...Last updated: March 18, 2003
The proposal is for construction of a natural gas fired cogeneration facility on a 2.5ha site located within Alcoa’s Pinjarra Alumina Refinery. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will own the facility and will supply steam to Alcoa for refinery purposes. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will sell the power generated to customers within the South-West Interconnected System (SWIS). Alcoa will operate the facility within the framework of the Pinjarra refinery operations. The... Read more...Last updated: January 6, 1994
The proposal is to establish an energy infrastructure in the Pilbara region of Western Australia. This proposal will provide natural gas and electric power for future industrial developments and includes: a 215 kilometre buried gas pipeline from Karratha to Port Hedland; a gas turbine power station at Port Hedland; approximately 400 kilometres of high-voltage power transmission line from Port Hedland to Newman; a back-up generating plant at Newman; and closure of the existing diesel powered... Read more...Last updated: October 27, 1992
The proposal is to establish a 2,500 kilowatt wind farm and associated 33kV powerline near Esperance. The wind farm is to be built within 'C' class Flora Reserve Number 24486, near Nine Mile Beach approximately 8km west of Esperance. Read more...