This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 26, 2023
The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 22, 2023
The proposal is for the construction and operation of a wastewater treatment plant, and associated ocean outfall, on the Alkimos-Eglinton Dunal System, with an ultimate processing capacity of 160 megalitres per day. Read more...Last updated: April 11, 2023
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...Last updated: March 27, 2023
Red Moon Property Holdings Pty Ltd and property lessee Altera Ltd propose to construct and operate Carpenter’s dam taking water from 4-mile brook. The proposal is to construct a dam not exceeding 3,400,000 cubic metres in capacity which includes an automatic bypass system that allows at least 8, 000 kilolitres of water to bypass the dam with excess water returned to the original watercourse. The proposal is in Beedelup, WA, approximately 20 kilometres Southwest of Manjimup, adjacent to the... Read more...Last updated: February 28, 2023
Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: January 18, 2023
The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: February 28, 2022
Change to conditions 1-1 (Implementation) and 2-1 (Proponent Commitments) Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: December 1, 2021
The Department of Transport is proposing to construct a safe and accessible boating facility at the existing boat ramp site at Entrance Point, Broome. The proposal is located within the existing Port of Broome port limits, approximately 350 metres south-west of the previously assessed Kimberley Marine Offloading Facility. The proposal includes construction of a boat ramp, two finger jetties, two groynes, an offshore breakwater and associated terrestrial public amenity infrastructure. Piling... Read more...