Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (2) Apply Iron Ore filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Flora and Vegetation (3) Apply Flora and Vegetation filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Terrestrial Fauna (3) Apply Terrestrial Fauna filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • 37 (1) Apply 37 filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Human Health (1) Apply Human Health filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Department of State Development (1) Apply Department of State Development filter
  • Department of Water (1) Apply Department of Water filter
  • Ferro Metals Australia Pty Ltd (1) Apply Ferro Metals Australia Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Mineralogy Pty Ltd (1) Apply Mineralogy Pty Ltd filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter

Filter by region:

  • Pilbara (3) Apply Pilbara filter
  • Mid West (2) Apply Mid West filter
  • Perth (2) Apply Perth filter
  • Great Southern (1) Apply Great Southern filter

Filter by last updated:

  • (-) Remove 2009 filter 2009
  1. Home
  2. Proposal search
  3. Infrastructure
  4. 2009
  5. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Iron ore mine, downstream processing (direct - reduced hot briquetted iron) and port construction, Cape Preston, Pilbara (s46)

Last updated: December 23, 2009

The construction and operation of a 44.8 million tonnes per annum iron ore mine, power station, desalination plant, processing plant and accommodation and port facilities in the Cape Preston area as documented in Schedule 1 of Statement 635. The processing plant will produce pelletised, direct-reduced iron and hot-briquetted iron. Inquiry under s46 into changing the conditions of Ministerial Statement 635. Read more...

Gnangara Mound Groundwater Resources (s46) [1723 and 1540]

Last updated: December 4, 2009

The management and abstraction of groundwater for public and private water supply from the Gnangara Mound, with provision for environmental water requirements In response to the Minister for Environment’s request to review the environmental monitoring sites in light of changes in environmental values and the predicted influence of climate variability the DoW has proposed to remove some criteria sites from the current environmental approval and to rationalise other conditions and commitments of... Read more...

Chichester Rail Deviation

Last updated: December 4, 2009

BHP Billiton Iron Ore is proposing to construct 23 kilometres of dual track railway and associated rail infrastructure within the Chichester ranges, approximately 220 kilometres south of Port Hedland. The proposal includes clearing of 400 hectares of vegetation. The required water supply would be approximately 1000 kL/day to be sourced from two existing bores. The proposal also involves the construction of communications cabling, a communications tower, level crossings, signalling, access... Read more...

Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Last updated: December 1, 2009

The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...

Oakajee Deepwater Port (s46) [1813]

Last updated: November 25, 2009

Department of State Development's request for a change to the environmental conditions that apply to the substantial commencement date for works at the Oakajee Deepwater Port, Shire of Chapman Valley. Previous Ministerial Statements 469 and 774 , previous assessments 1074 and 1722. Read more...

Roe Highway Stage 7 Extension (South Street, Canning Vale to Kwinana Freeway, Leeming)

Last updated: October 11, 2009

The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha). Approximately 53.9 ha of this area will... Read more...

Balla Balla Magnetite Project

Last updated: April 28, 2009

The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...

Albany Protected Harbour Development, Princess Royal Harbour, Albany

Last updated: February 19, 2009

LandCorp proposes to construct a boat harbour for commercial and recreational craft through the expansion of the existing Albany Town Jetty with a breakwater that will shelter a 6.6 hectare area of water. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.