Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Land use (2) Apply Land use filter
  • Industrial (1) Apply Industrial filter
  • Iron Ore (1) Apply Iron Ore filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • State Energy Commission of Western Australia (3) Apply State Energy Commission of Western Australia filter
  • Department of Marine and Harbours (1) Apply Department of Marine and Harbours filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Peel Waterways Pty Ltd (1) Apply Peel Waterways Pty Ltd filter
  • Shark Bay Salt Joint Venture (1) Apply Shark Bay Salt Joint Venture filter
  • Water Authority of Western Australia (1) Apply Water Authority of Western Australia filter

Filter by region:

  • South West (2) Apply South West filter
  • Gascoyne (1) Apply Gascoyne filter
  • Great Southern (1) Apply Great Southern filter
  • Mid West (1) Apply Mid West filter
  • Peel (1) Apply Peel filter
  • Perth (1) Apply Perth filter
  • Pilbara (1) Apply Pilbara filter

Filter by last updated:

  • (-) Remove 1992 filter 1992
  1. Home
  2. Proposal search
  3. Infrastructure
  4. Ministerial Statement published
  5. 1992

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Albany sewage treatment and disposal of water

Last updated: October 7, 1992

The Water Authority of Western Australia has proposed that all municipal wastewater from Albany undergo secondary treatment at the Timewell Road (No. 2) plant prior to being piped and irrigated onto trees and pasture at a land disposal site on the outskirts of Albany. This proposal constitutes part of a long-term plan to rehabilitate the eutrophic Princess Royal Harbour and would result in the removal of the Point King sewage outfall (a significant source of nutrients to the harbour). Read more...

Marandoo Iron Ore Mine and Central Pilbara Railway

Last updated: October 6, 1992

The proposal is for an iron ore mining operation at Marandoo, 35 kilometres east-north-east of the town of Tom Price, in an enclave within Karijini National Park, and a railway line from the existing Paraburdoo-Dampier railway line, to service Marandoo. The rail line would then continue past Marandoo to connect with proposed future mines in the Central Pilbara. Read more...

Proposal for additional landscape works and extension of fly ash ponds - Turkey Point, Bunbury

Last updated: August 7, 1992

Additional landscape works and the extension of Fly-Ash Ponds at Turkey Point, Bunbury. Read more...

Shark Bay Salt, pond expansion, Useless Inlet

Last updated: July 21, 1992

The proposal is to increase production capacity by constructing a levee across Useless Inlet near the northern limit of the mining lease which is about 7 km from Clough's Bar. The levee would be constructed of earthen materials taken from two quarries on either side of Useless Inlet and would have an engineering design similar to that of other breakwaters, such as at Hillary's Marina, with a relatively impermeable core of sandy material and an outer covering of rock. There would be... Read more...

Harvey to Kwinana 330Kv Transmission Line - Proposed adjustment to alignment (s46) [710]

Last updated: June 25, 1992

The State Energy Commission have agreed to a request by the Department of Planning and Urban Development to change the proposed route of the Harvey - Kvvinana 330kV transmission line at Mandogalup (near Kwinana). The proposed realignment requires amendments to the environmental conditions of Ministerial Statement 41 , and this is the inquiry under s46 into the proposed amendments. Read more...

Beenup power supply

Last updated: March 12, 1992

The proposal is to construct and operate a 132 kilovolt (kV) transmission line between either the Picton or Manjimup substations and Mineral Deposits Limited proposed mineral sands mine at Beenup. SECWA's preferred option is for an overhead supply at 132kV from the Manjimup substation. Two other options from Picton (Great North Road and Margaret River) are also proposed. Read more...

Coral Coast marina, residential subdivision and quarry, Exmouth

Last updated: January 20, 1992

The proposed development concept lor the Coral Coast Marina Resort is for a marina, an associated recreational holiday resort, commercia! facilities and a residential subdivision inland from the marina development. Significant drainage diversion works are necessary to accommodate the proposed marina and residential development. A quarry is required to provide armour stone for breakwater and groyne construction. The Stage 1 marina wou!d have a harbour with an approximate water area of 15.5 ha... Read more...

Extension to Yunderup Canals Estate

Last updated: January 17, 1992

The proposal to extend Yunderup Canals involves the construction of two additional canals. One canal is located to the east of the existing development on Lots 5, 6, 7 and 8 Kiap Road (17 .2 ha) and is aligned north-south, and the second canal is located to the north of the entrance to the existing development on Lot 18 Warma Way (5.7 ha) and is aligned northeast-southwest. The proposed development will include 7.4 ha of new canal waterway, 160 residential lots, a local store with a petrol... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.