ProjectProponent: State Energy Commission of Western AustraliaProposal description: The proposal is to construct and operate a 132 kilovolt (kV) transmission line between either the Picton or Manjimup substations and Mineral Deposits Limited proposed mineral sands mine at Beenup. SECWA's preferred option is for an overhead supply at 132kV from the Manjimup substation. Two other options from Picton (Great North Road and Margaret River) are also proposed. Assessment Number: 510Region: South WestReferred under EP Act: s38Industry sector: InfrastructureLast updated: March 12, 1992Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Consultative Environmental ReviewDate published: Friday, 24 August, 1990 3. AssessmentScopingApproved: Wednesday, 28 November, 1990 Environmental ReviewPublic submissions: Monday, 2 September, 1991 to Monday, 30 September, 1991Environmental Review documentation: Consultative Environmental Review document (PDF, 23.17 MB) 4. EPA Report on assessmentEPA Report Number: 603EPA Report: Beenup power supply (PDF, 5.16 MB)Date published: Friday, 6 December, 1991Appeals close: Friday, 20 December, 1991 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Thursday, 12 March, 1992Ministerial Statement: Ministerial Statement 228 (PDF, 553.02 KB)