Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • (-) Remove Iron Ore filter Iron Ore

Filter by current status:

  • Ministerial Statement published (6) Apply Ministerial Statement published filter

Filter by relevant environmental factors:

  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • 37 (1) Apply 37 filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Landforms (1) Apply Landforms filter
  • Social Surroundings (1) Apply Social Surroundings filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • Australian Aboriginal Mining Corporation Pty Ltd (1) Apply Australian Aboriginal Mining Corporation Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Iron Ore Pty Ltd (1) Apply BHP Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter

Filter by region:

  • Pilbara (5) Apply Pilbara filter
  • Great Southern (1) Apply Great Southern filter

Filter by last updated:

  • (-) Remove 2015 filter 2015
  1. Home
  2. Proposal search
  3. Iron Ore
  4. Infrastructure
  5. 2015

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Marandoo Iron Ore Project – Revised Proposal

Last updated: October 28, 2015

Hamersley Iron Pty Limited proposes to revise the Marandoo project located approximately 37 kilometres east of Tom Price. The proposal involves additional clearing of 400 hectares and the amalgamation of the three existing Ministerial Statements 286, 598 and 833. Read more...

West Angelas - Revised Proposal (Deposit A West and Deposit F)

Last updated: August 21, 2015

Robe River Mining Co. Pty Ltd proposes to revise the West Angelas Iron Ore Mine to include mining above and below the water table of Deposit A west and Deposit F, as satellite deposits to the existing operation. The project is located 130 kilometres northwest of Newman in the Pilbara. The proposal includes additional clearing up to 3,223 hectares (ha), an extension of the development envelope of up to 2,750 ha and an increase in abstraction of groundwater of up to 1 gigalitre per annum. Read more...

Orebody 18 Iron Ore Mine (s. 46)

Last updated: August 7, 2015

The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...

Extension Mining Proposal

Last updated: May 14, 2015

The proposal is to construct and operate an open cut iron ore mine and associated infrastructure for the extraction, processing and transport of iron ore. The proposal is located approximately 70 km north-west of Newman in the Pilbara region of Western Australia. Read more...

Albany Port Expansion Project (s. 46)

Last updated: May 4, 2015

The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Inquiry under... Read more...

Orebody 18 Iron Ore Mine

Last updated: February 3, 2015

The proposal is to develop an open cut iron ore mining operation at Orebody 18 on Mineral Lease 244SA involving mining 116 Mt of ore at a rate of up to 15 Mtpa for a mine life of 12 to 15 years. Support infrastructure includes an 8 km rail spur and crushing, screening and load out facilities. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.