This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 4, 2015
The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Inquiry under... Read more...Last updated: May 1, 2015
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: March 25, 2015
Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 799 . Read more...Last updated: March 4, 2015
The proposal is for the construction and operation the Kintyre uranium project. The proposal includes the open cut mining of uranium ore, processing, and the transport of uranium ore concentrate to the Port of Adelaide. The project is located 260km north-east of Newman in the East Pilbara region of Western Australia. Read more...Last updated: March 4, 2015
The extraction of silica sands from two new areas and the transfer of the ownership of land which contains the Muchea Limestone Communities Threatened Ecological Community to the conservation estate. Inquiry under s46 in regard to amending Ministerial Statements 703 and 920 . Read more...Last updated: February 20, 2015
The proposal is to develop the Jackson 4 (J4) deposit and construct and operate an iron ore mine and supporting infrastructure, access track and haul road in the Goldfields region of Western Australia, approximately 60 kilometres north-west of Koolyanobbing. Read more...Last updated: February 20, 2015
The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources. Read more...Last updated: February 18, 2015
Derived Proposal, : Lot 21 Alumina Road, East Rockingham identified in plan of subdivision titled Subdivision Concept Plan Lot 21 Alumina Road, East Rockingham dated 31 January 2014. Read more...Last updated: February 9, 2015
The proposal is for the construction and operation of a diamond mine, power station and processing plant within Mining Lease 04/372 in the West Kimberley area 140 kilometres east of Derby, to process approximately 4.4 million tonnes per annum of ore. Read more...Last updated: February 3, 2015
The proposal is to develop an open cut iron ore mining operation at Orebody 18 on Mineral Lease 244SA involving mining 116 Mt of ore at a rate of up to 15 Mtpa for a mine life of 12 to 15 years. Support infrastructure includes an 8 km rail spur and crushing, screening and load out facilities. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...