This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 27, 2017
Plantrite Nursery has applied to the City of Swan for retrospective planning approval for the expansion of its existing 5 hectare (ha) native plant nursery on Lot 88 Bingham Road Bullsbrook (Lot 88). This expansion is proposed to be completed over two stages totalling 10.67 ha; Stage 1 covering 4.76 ha and Stage 2 covering 5.91 ha. However approximately 2.5 ha of Stage 1 has already been constructed. The expansion will also require a new groundwater abstraction licence. Stage 2 is only proposed... Read more...Last updated: November 20, 2017
Cottesloe Pier Pty Ltd proposes to construct a pier extending off the end of the current Cottesloe groyne. The project design consists of a jetty and boardwalk structure including an underwater observatory, cafe, swimming area and fishing jetty. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...