This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 22, 2021
The proponent, Cliffs Asia Pacific Iron Ore Pty Ltd (Cliffs), owns and operates iron ore mines at the Windarling Range, the Mt Jackson Range and the Deception Deposit (collectively known as the "Yilgarn Operations") within the Shire of Yilgarn and Shire of Menzies. The Yilgarn Operations are authorised under seven Ministerial Statements issued between 2003 and 2012 by the Western Australian Minister for Environment under section 45(5) of the EP Act. These are: Ministerial Statement... Read more...Last updated: November 20, 2013
The proposal is to construct and operate an open cut iron ore mine and haul road at the Windarling Range W4 East Deposit, located approximately 130 kilometres north of Southern Cross. Read more...Last updated: November 5, 2013
The proposal is to construct and operate an open cut iron ore mine, waste rock landform, ore stockpile, haul road and associated infrastructure, 150 kilometres north of Southern Cross. Read more...Last updated: August 29, 2012
The proposal is situated on Mining Leases M77/999 and M77/1000, approximately 130 kilometres north of Southern Cross in the Shire of Yilgarn. The proposal is to mine iron ore by open cut mining below the groundwater table in the portion of the W3/5 Deposit at Windarling Range. The depth of the open-cut mine will increase from nominally 400 metres Australian Height Datum (AHD) to nominally 315 metres AHD. Read more...Last updated: May 30, 2012
The proposal is for open-cut mining of iron ore (haematite) below the groundwater table at the currently mined W2 pit at Windarling, approximately 90 kilometres north-north-east of Koolyanobbing. The open-cut mine will require a depth increase of approximately 114 metres from nominally 402 metres Australian Height Datum (AHD) to 288 metres AHD. This will enable mining of an estimated six million tonnes of ore. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...