This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 21, 1991
SECWA proposes to expand the generating capacity of the approved Pinjar gas turbine power station site (eight 37MW units) by approximately 300 megawatts (MW). This represents a doubling in the power generating capacity of the power station. In SECWA's original proposal (approved under Ministerial Statement 61 ) the plant was proposed to be a peaking plant which can operate at times of high demand (1 to 8 hours per day) or in emergencies. In this expansion proposal the new gas turbines are... Read more...Last updated: June 12, 1991
The proposal is to establish a second coal-fired base load power station 8km east-north-east of Collie. The proposal includes the construction of two 300 megawatt power generating units and associated infrastructure that will occupy 388 hectares of land. The proposed site is located on the edge of the Collie Coal Basin which is an area that contains the mineable coal reserves in the Collie region., The report:, An integral part of the environmental impact assessment process includes the need to... Read more...