This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 22, 1989
The proposal is to mine and process ore from the supergene/basement deposits at the Boddington Goldmine. The supergene orebody is that zone of mineralisation which lies at the interface of the weathered oxide zone and the fresh basement rock. Standard open cut methods, as currently employed for the oxide ore mining operation, will be utilised to mine the deeper supergene and basement ores. The supergene and some basement ores contain copper mineralisation which can interfere with the existing... Read more...Last updated: September 18, 1989
Cable Sands (WA) Pty Ltd has submitted a proposal to mine a deposit of mineral sands approximately 5km to the east of Busselton, near the junction of Vasse and Bussell Highways. Read more...Last updated: May 1, 1989
The proposal which Nufarm-Coogee has submitted for assessment is as follows: Separation of conditions and commitments in Ministerial Statement 1 , devolving those related to the Chlor-Alkali Plant to Nufarm-Coogee, with the remainder continuing to be the responsibility of SCM Chemicals Ltd; Changing commitments for a foam suppression system in the chlorine storage area. remotely operated valves (ROVs) on the liquified chlorine line. and excess flow valves on the liquified chlorine line; and,... Read more...Last updated: March 30, 1989
The proposal is for the construction of a standard 22 kV three phase wood pole distribution line from Northcliffe to the Windy Harbour settlement, a distance of approximately 30 kilometres. For much of its length, the powerline would pass through the D'Entrecasteaux National Park and an area which has been proposed as national park under the Department of Conservation and Land Management's (CALM) Shannon Park and D'Entrecasteaux National Park Management Plan 1987/88 and the... Read more...Last updated: March 1, 1989
The proposed Bunbury Holiday Resort involves a resort complex on 21.8 hectares of land at Point Douro peninsula, on the northern side of the Collie River Delta. Read more...