This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 13, 1995
In 1989 the Water Authority of Western Australia referred to the Environmental Protection Authority a proposal to build a second ocean outfall from the Beenyup Wastewater Treatment Plant into Marmion Marine Park. Some conditions which related solely to the pre-construction and construction phases have now been satisfactorily completed and formally cleared. They are no longer necessary and can now be deleted. Read more...Last updated: November 16, 1994
The Water Authority of Western Australia (WAWA) proposes to construct a service reservoir within the Neerabup Water Supply Reserve 34537 together with associated pipework within the Neerabup Water Supply Reserve 34537 which would be built through Neerabup National Park. Read more...Last updated: October 3, 1990
The Water Authority has stated that following the completion of the Pinjar groundwater development, a new major water supply source will be required by 1992. This reasoning is based on current and predicted water consumption demand even in view of the Water Authority's public water conservation programme. Because of the extent, magnitude and likely environmental implications of developing a new water supply source, the EPA required the Water Authority to prepare an ERMP for this project.... Read more...Last updated: July 20, 1990
The proposal is to redevelop the existing Victoria Reservoir on Munday Brook, approximately 20 kilometres east of Perth. This is considered necessary by the Water Authority of Western Australia due to the age and condition of the existing dam, and timely in view of the current residential and rural development pressures being placed on the associated water catchments. Redevelopment of the Victoria Reservoir would involve the creation of a new larger dam to replace the existing structure to gain... Read more...Last updated: July 13, 1990
The proposal, by the Water Authority of Western Australia, consists of a preferred option of constructing a 1420 mm diameter pipeline from the Water Authority of Western Australia's property adjacent to the Ocean Reef Boat Harbour, out to sea for a distance of 1800 m. This proposal will increase the capacity to dispose of treated wastewater from the current level of 54 Megalitres per day (ML/day) to a maximum of 150 ML/day. The secondary treated effluent will be discharged into the ocean... Read more...Last updated: March 8, 1988
The proposal is to continue to develop the grouundwater resources of the Gnangara Mound for public water supply requirements. Read more...