This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 18, 2013
The Public Transport Authority of Western Australia proposes to develop a pedestrian bridge over the Swan River linking the East Perth foreshore to the Burswood Peninsula and the construction of a bus hub at East Perth. The proposal forms the third component (Part 3) of the new Perth Stadium Project, Part 1 being the construction of the Stadium and associated Sports Precinct, and Part 2 being the construction of the Transport Corridor Infrastructure including rail works and upgrades to the... Read more...Last updated: September 2, 2013
Water Corporation is proposing to implement a 14 gigalitre per annum groundwater replenishment scheme (GWRS) of recycled wastewater to the Leederville and Yarragadee aquifers, located on the Swan Coastal Plain. Read more...Last updated: July 15, 2013
Antoine (Tony) and Malaky Sader propose to replant an area of approximately 2000 square metres of Lot 54 Wolfe Road, Banjup. Read more...Last updated: March 18, 2013
The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...Last updated: March 13, 2013
Burswood Nominees Ltd intends to develop a 25 storey hotel addition at their integrated Crown Perth complex in Perth. The development will comprise two distinct areas: the Towers, which will accommodate a total of 500 rooms; and the low-rise Podium, which will contain a large convention and meeting complex, restaurants, retail and public spaces. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...