This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 13, 2017
The proposal is to extend the Kwinana Freeway 2x2 lane, dual carriageway from Forrest Road to Thomas Road, with major on and off ramps at Russel/Gibbs Roads, Rowley Road, Hope Valley Road and Thomas Road. Provision for upgrading the freeway to a 2x3 lane dual carriageway has been included in the proposal. It has also been proposed to incorporate a dual use path within the freeway reserve, located to the west of the road surface. The alignment of the Forrest Road to Thomas Road section of the... Read more...Last updated: November 14, 2001
The proposed airport will be located in a site approximately 12 km north-east of Broome townsite. The proposal involves the construction of one main runway, parallel taxiway, turning nodes, apron parking, general aviation parking, maintenance and storage hangers and fuel storage. It also includes domestic and international terminals, land-side and airside commercial activities and a short future parallel runway for light aircraft. Read more...Last updated: November 6, 1996
The proposal is to dredge two channels to connect the Swan River with an internal artificial water body. Construction of the channel will involve: dredging of one 15m wide, 1 m deep channel through the System 6 area and near shore sandbars at the northern end of the wetland; the excavation of a 55m wide channel to -2.5m AHD, through the southern end of the tip site; plus the dredging of a 320m long, 55m wide navigation channel to -2.5m AHD through river shallows to connect with the main deep... Read more...