This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 24, 2013
The proposal is to develop an iron ore mine and associated infrastructure in the Goldfields region, 450 kilometres (km) east-north-east of Perth. The proposal includes a borefield and adjoining water pipeline 60km west of the mine site and a rail siding 130km east of the mine site and 8km south of Menzies. Read more...Last updated: October 9, 2013
The proposal involves extensions to mines at Yarrie and Sunrise Hill, new mines at Nimingarra (Nim I), Cattle Gorge and associated infrastructure such as haul roads and a power line. The proposal also seeks to revise the decommissioning and rehabilitation plan for the entire Goldsworthy operations. Read more...Last updated: September 11, 2013
The Brockman 2 Detrital Iron Ore Mine (B2 Project) commenced mining operations in 1992 in the central Pilbara region of Western Australia. It is located in the Brockman Syncline area, approximately 55 kilometres (km) northwest of Tom Price. Ore from the mine is currently exported through Dampier and Cape Lambert ports. This proposal is for the Phase 2B development of the B2 Project and involves further development of parts of the existing Pit 4 Extension, Lower Pit 4, Valley Pit and Pit 6 to an... Read more...Last updated: August 22, 2013
The proposal is to develop an open-cut iron ore mine and associated infrastructure at the Turee Syncline deposit, located approximately 30 kilometres north-east of Paraburdoo. Read more...Last updated: August 9, 2013
Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...Last updated: July 17, 2013
The proposal is to subdivide Lot 504 Lexia Avenue, Upper Swan into three rural lots. The EPA considers that the proposal, as described, cannot meet the EPA’s environmental objectives for: specially protected (threatened) fauna; regionally significant vegetation, wetlands and watercourses; and surface water quality and quantity. Read more...Last updated: June 12, 2013
Inquiry under s46 - request to to amend Ministerial Statement 830 to contemporise and rationalise existing conditions. Read more...Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: April 29, 2013
The development and operation of a quarry. Inquiry under s46 to delete conditions 11, 12 and 17 of Ministerial Statement 706 and condition 6 of Ministerial Statement 872 . Read more...Last updated: March 18, 2013
The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...Last updated: March 13, 2013
Burswood Nominees Ltd intends to develop a 25 storey hotel addition at their integrated Crown Perth complex in Perth. The development will comprise two distinct areas: the Towers, which will accommodate a total of 500 rooms; and the low-rise Podium, which will contain a large convention and meeting complex, restaurants, retail and public spaces. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...Last updated: January 4, 2013
Kemerton Silica Sand Mining Proposal, additional mining areas and transfer of land for conservation - section 46 request for change to implementation conditions of Ministerial Statement 703 . Read more...Last updated: December 24, 2012
The Environmental Protection Authority (EPA) has received a referral from the Rottnest Island Authority (RIA) to revitalise the island’s 22 hectare public golf course, west of the Thomson Bay settlement. Read more...Last updated: December 4, 2012
The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...Last updated: October 4, 2012
Request to change implementation conditions of Ministerial Statement 126 . Read more...Last updated: August 1, 2012
The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...Last updated: July 24, 2012
The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...