This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 9, 2013
Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...Last updated: March 18, 2013
The Environmental Protection Authority (EPA) has received a referral on the proposal to maintain a permanent water body in Lake Jualbup. The proposal is to convert Lake Jualbup into a constructed lake by lining the lake bed with a polymer additive and constructing sloped banks and concrete walls to reduce water loss to the surrounding environment. The EPA considers that the potential environmental issues associated with the proposal are: • Water quality impacts on aquatic fauna, • Impacts on... Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...