This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...Last updated: May 23, 2003
The proposal is for the construction, operation, and maintainance of a natural gas fired combined cycle gas turbine (CCGT) power plant with a nominal generation capacity of 120 megawatts (MW) on a site located at Part Lot 131 Mason Road, on the southwestern corner of Donaldson Road and Burton Place, off Mason Road, Kwinana. The plant will provide approximately 1,045 gigawatt hours (GWhr) of electricity annually into the South West Interconnected System (SWIS) electricity market. Read more...Last updated: December 9, 2002
Proposal by Mr John Fernie to clear approximately 570 hectares (ha) of native vegetation for pine and sandalwood plantation on Lot 7778 Wannamal South Road, Wannamal. Lot 7778 has a total area of 1,750 ha and is located approximately 12 kilometres northeast of Gingin, in the Shire of Gingin. Read more...Last updated: December 6, 2002
Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: March 18, 2002
The Brookdale Liquid Waste Treatment Facility (LWTF) has been operating under environmental approvals since 1988 as a septage treatment plant. The facility was also licenced by the Department of Environmental Protection (DEP) to receive some specific types of hazardous liquid waste for treatment to render them nonhazardous or utilised on-site as reagents for treating other liquid wastes. This proposal is for a change to plant processes and waste acceptance criteria for this facility to enable... Read more...Last updated: March 1, 2002
The Western Australian government has committed to remediating three contaminated sites on the west side of Morangup Road, approximately 25km south-west of Toodyay. A small amount of contamination from Site C has entered Lot 12. This contamination will be removed as part of Site C’s remediation. Read more...Last updated: February 12, 2002
The proposal is to clear 100 hectares of native vegetation on Kent Location 1910 for agriculture. Specifically, the stated purpose of the proposed clearing is to enable the expansion of an existing grazing and cropping enterprise. Location 1910 is located approximately 40 km south of Jerramungup on Roberts Road, in the Shire of Jerramungup. The proposed clearing, if allowed to proceed, would reduce the amount of native vegetation on the property from 400 hectares (approximately 36% of the... Read more...Last updated: February 6, 2002
Proposal by the Midland Redevelopment Authority (MRA) to remediate 22 hectare (ha) of land which includes a portion of the former Midland Railway Workshop Site (Area E) within the Clayton Precinct, Clayton Street road extension and the Helena Street and Viveash Road rail crossings outside of the Clayton Precinct in Midland. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: January 7, 2002
This proposal is to clear approximately 580 hectares (ha) of native vegetation on Melbourne Location 3544 within the Shire of Dandaragan for agriculture. Specifically, the stated purpose of the proposed clearing is to allow for grazing and a timber plantation. Read more...Last updated: January 2, 2002
The proponent, Mr R Klaassen, proposes to clear approximately 477 hectares of native vegetation on Victoria Location 10335, Shire of Dandaragan for agriculture and / or plantation forestry. Read more...Last updated: November 10, 2000
The proposal is to mine titanium minerals from Orebodies 27, 200 and 28000, adjacent to the southern mining operations of the existing Cooljarloo Mineral Sands mine, located 10 kilometres north-west of Cataby, Shire of Dandaragan. Read more...Last updated: September 14, 2000
The proposal is for the widespread distribution and use of bauxite residue from Alcoa of Australia's Kwinana, Wagerup and Pinjarra refineries for the purpose of soil amendment for the currently approved land use activities on the Swan Coastal Plain portion of the catchment of the Peel inlet and Harvey Estuary. This inquiry under s46 is in regard to a request for extension of approval time limit. Read more...Last updated: August 9, 2000
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: May 26, 2000
The proponent has notified to clear approximately 266 hectares (ha) of native vegetation on Fitzgerald Locations 470, 525, 527, 557 and 1480, north-west of Salmon Gums, Shire of Esperance Read more...Last updated: April 19, 2000
The Western Australian Planning Commission proposes to remediate portions of 50.56 hectares (ha) of government land along the Owen Anchorage coastline in South Coogee. Read more...Last updated: March 13, 2000
Aurex Pty Ltd in joint venture with Mr KJ Fitzgerald, proposes to mine gypsum at Red Lake, 46 km north-east of Merredin within Mining Lease application M77/528 which is a vacant Crown land "window" within the Lake Campion "C" Class Nature Reserve 24789. Read more...