This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 4, 1990
The proposed Yakabindie minesite is located within the lease area of the Yakabindie Pastoral Station approximately 5 kilometres east of the main Leinster to Wiluna road. An open cut mine is proposed to be developed at the site to produce approximately 6 million tonnes of low grade nickel sulphide ore per annum and 25 million tonnes of waste rock per annum. Mining will be carried out using conventional large-capacity diesel powered earthmoving equipment such as excavators, haul trucks and... Read more...Last updated: October 26, 1988
The proposal is for an Integrated Waste Disposal facility in the Eastern Goldfields region. The facility would be owned and operated by the Health Department and only wastes generated in Western Australia would be accepted for disposal. The proposal includes: a high temperature incinerator for the disposal of organochlorines, which at this stage include agricultural chemicals and polychlorinated biphenyls (PCB's); and an area for burial of intractable solid wastes which include low level... Read more...Last updated: June 3, 1988
The proposal is to develop a project which would reprocess old gold tailing dumps located in the Golden Mile, Kalgoorlie. Anglo American Pacific Limited plans to treat 32.5 million tonnes which may increase to 57 million tonnes if additional dumps are incorporated. The project would mine the old tailings dumps using high pressure water jets from monitor guns. The slurry of tailings would be pumped from the monitor station to the plant site, and then passed through a carbon-leach/carbon in pulp... Read more...Last updated: May 23, 1988
The proposal is to construct and operate a new concentrate roasting facility 17 km north north-west of the Kalgoorlie Town Centre. The proposed roaster would be required to treat approximately 190 000 tonnes per annum of concentrate. This would result in the production of 16 000 kg/hr of sulphur dioxide. A concentrate containing typically 27% iron, 33% sulphur and 35 gram per tonne of gold, would be piped as a slurry to the roaster from the proposed Fimiston Plant. The slurry would then be fed... Read more...Last updated: November 27, 1987
The proposal is to incinerate approximately 1,000 tonnes of Polychlorinated Biphenyls (PGBs), over a 3-5 year period, at a waste disposal facility to be located in the proximity of Koolyanobbing, approximately 53 km north of Southern Cross. The proposal consists of transporting the PCBs from storage and handling facilities in Perth and the Pilbara to the incinerator site at an abandoned hard rock quarry near Koolyanobbing, a former mining town currently inhabitated by two caretakers and their... Read more...