Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter
  • Infrastructure (1) Apply Infrastructure filter
  • Land use (1) Apply Land use filter
  • Mineral sands (1) Apply Mineral sands filter

Filter by current status:

  • Ministerial Statement published (3) Apply Ministerial Statement published filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by preliminary environmental factors:

  • Flora and Vegetation (1) Apply Flora and Vegetation filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • Bunbury Holiday Resort Pty Ltd (1) Apply Bunbury Holiday Resort Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • Nufarm-Coogee Pty Limited and SCM Chemicals Limited (1) Apply Nufarm-Coogee Pty Limited and SCM Chemicals Limited filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • (-) Remove South West filter South West

Filter by last updated:

  • (-) Remove 1989 filter 1989
  1. Home
  2. Proposal search
  3. South West
  4. 1989

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Boddington Gold Mine Project - mining and processing of supergene/basement ores

Last updated: November 22, 1989

The proposal is to mine and process ore from the supergene/basement deposits at the Boddington Goldmine. The supergene orebody is that zone of mineralisation which lies at the interface of the weathered oxide zone and the fresh basement rock. Standard open cut methods, as currently employed for the oxide ore mining operation, will be utilised to mine the deeper supergene and basement ores. The supergene and some basement ores contain copper mineralisation which can interfere with the existing... Read more...

Busselton mineral sands deposit

Last updated: September 18, 1989

Cable Sands (WA) Pty Ltd has submitted a proposal to mine a deposit of mineral sands approximately 5km to the east of Busselton, near the junction of Vasse and Bussell Highways. Read more...

Proposed Separation of Environmental Responsibilities - Chloride Process Pigment Plant, Kemerton

Last updated: May 1, 1989

The proposal which Nufarm-Coogee has submitted for assessment is as follows: Separation of conditions and commitments in Ministerial Statement 1 , devolving those related to the Chlor-Alkali Plant to Nufarm-Coogee, with the remainder continuing to be the responsibility of SCM Chemicals Ltd; Changing commitments for a foam suppression system in the chlorine storage area. remotely operated valves (ROVs) on the liquified chlorine line. and excess flow valves on the liquified chlorine line; and,... Read more...

Proposed Northcliffe to Windy Harbour 22KV distribution line

Last updated: March 30, 1989

The proposal is for the construction of a standard 22 kV three phase wood pole distribution line from Northcliffe to the Windy Harbour settlement, a distance of approximately 30 kilometres. For much of its length, the powerline would pass through the D'Entrecasteaux National Park and an area which has been proposed as national park under the Department of Conservation and Land Management's (CALM) Shannon Park and D'Entrecasteaux National Park Management Plan 1987/88 and the... Read more...

Proposed Bunbury Holiday Resort

Last updated: March 1, 1989

The proposed Bunbury Holiday Resort involves a resort complex on 21.8 hectares of land at Point Douro peninsula, on the northern side of the Collie River Delta. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.