This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 23, 2025
Tronox Management Pty Ltd are proposing to expand the existing Cooljarloo Mineral Sands Project by mining a satellite pit named Osprey. The project is located approximately 20 kilometres northwest of Cataby. The Osprey Expansion has a disturbance footprint of 61 hectares (ha) of which 59.14 ha is native vegetation. Dredge mining will be used to avoid pit dewatering. Water for mining and concentrating will be sourced from existing licenced bores. The final mine void will be backfilled above the... Read more...Last updated: June 21, 2025
Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...Last updated: April 7, 2025
The proposed synthetic rutile plant is based on the existing plant commissioned in 1986 and pilot scale work undertaken since 1991. The proposal involves the construction of a second kiln and supporting plant, a wet processing section of conventional design or new technology, a liquor containment and waste handling system, and a relocated and expanded artificial wetland. Engineering design and process improvements would be incorporated into the project utilising experience and expertise gained... Read more...Last updated: February 25, 2025
The proposal is for the development of a titanium minerals mine at Tutunup, approximately 20 km east of Busselton. The proposal has the following main components: disturbance of 120 hectares of mainly cleared agricultural land; construction of water and fines dams, and topsoil, tails and overburden stockpiles; dewatering and mining, using dry mining techniques at up to two million tonnes per annum; abstraction of groundwater from the Yarragadee aquifer for process use; haulage of the Heavy... Read more...