This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 9, 2025
Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...Last updated: July 7, 2025
Horizon Power proposes to construct and operate the Derby Future Energy System (FES) for energy supply to the town of Derby within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 21 megawatts (MW), battery energy storage systems (BESS) up to 10 MW, a new thermal power station up to 8 MW, and a transmission network connection route. The thermal power station will be installed adjacent to the existing power station on Broome... Read more...Last updated: June 6, 2025
The proposal is to construct and operate a wind farm and linear infrastructure to provide renewable energy to Fortescue mining operations within the Pilbara. The proposal comprises of wind turbines, 220 kV transmission lines, substations and switchyards, 33 kV reticulation lines, a borefield, roads, pipelines, corridors of overhead lines, battery energy storage, accommodation camps, wastewater treatment plant, optional airstrip and supporting infrastructure. The Proposal is located... Read more...Last updated: June 3, 2025
Horizon Power proposes to construct and operate the Broome Future Energy System (FES) for energy supply to the town of Broome within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 90 megawatts (MW), battery energy storage systems (BESS) and a network connection route. The solar PV and BESS will be installed at a site approximately 10 km north of Broome. A network connection route will connect the solar PV and BESS to the... Read more...Last updated: May 26, 2025
The Proposal is for the construction and operation of a renewable energy solar generation hub to power Fortescue mining operations in the Pilbara region. It is located approximately 120 km south of Port Hedland and is within the Kariyarra Native Title determination area. The Proposal comprises the installation of solar panels and substation with an estimated total capacity of 644 MW and 220 kV transmission line spurs connecting the Proposal to Fortescue’s existing Pilbara Energy Connect (PEC)... Read more...Last updated: May 19, 2025
The proposal is for the extension of the existing Kwinana Swift Power Station (KSPS) to increase the site’s total generation capacity to 370 megawatts (MW). It involves the construction and operation of 250 MW Open Cycle Gas Turbine (OCGT) and associated infrastructures. The existing KSPS units are not part of this proposal. The K2 power station would operate as a peaking power station, connecting into the South West Interconnected System (SWIS) to supply additional power during periods of peak... Read more...Last updated: April 13, 2025
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: March 31, 2025
Development of Parron Wind Farm, located approximately 8 km north-west of Badgingarra, Western Australia. The Development Envelope is approximately 8,527.4 hectares with a total Disturbance Footprint of 491.54 ha. The Proposal involves the construction of up to 79 Wind Turbine Generators (WTG) capable of generating up to 489.8 MW along with associated infrastructure including access roads, electrical cabling and a substation. The wind farm will be connected to the existing 330kV transmission... Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: January 6, 2025
Development of a wind farm approximately 7 km east of the township of Williams and 9 km west of the township of Narrogin in Western Australia. The Proposal will involve the construction and operation of up to 25 turbines, a battery energy storage system (BESS) and ancillary infrastructure. It is located across numerous freehold properties that are primarily cleared for agricultural purposes. The proposal includes no more than 7.41 ha of remnant native vegetation clearing and 0.98 of planted... Read more...