This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 19, 1997
The proposal is to manage an additional 67 ,500m 3 of contaminated material as part of the rehabilitation of former industrial land at McCabe Street, Mosman Park . Clean-up of this industrial land commenced in 1995 and has been subject to three previous assessments (EPA Bulletins 324, 699 and 807). The proponents are seeking to amend the existing conditions of approval ( Ministerial Statement 338 ) under Section 46 of the, Environmental Protection Act 1986, to allow for disposal of the... Read more...Last updated: November 25, 1997
The proposal is to drill and evaluate a land-based exploration well, Melanie-1, on Cape Range Peninsula for a gas and oil target. The proposal does not include any future plans to develop a gas or oil field. The proposed Melanie-1 exploration well is located near the north western tip of Cape Range Peninsula, inland of the Yardie Creek Road and behind the line of hills which form the continuation of Cape Range. The project site, which covers an area of approximately 0.8 hectares, is... Read more...Last updated: November 21, 1997
The proposal is to establish Class IV waste disposal cells at the proponent's existing Red Hill Waste Disposal Facility. These waste cells would provide for the disposal of low hazard wastes, including contaminated soils and household hazardous wastes, within the Perth metropolitan area. The facility is located approximately 12 km north east of Midland on Toodyay Road, Red Hill. Read more...Last updated: August 28, 1997
The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...Last updated: July 15, 1997
Main Roads of Western Australia has proposed to build further portions of the Roe Highway from Welshpool Road, Beckenham to South Street, Canning Vale. Main Roads has indicated that Roe Highway will provide access to areas of manufacturing concentration and access to the termini of National Highways, airports, ports, freight forwarding centres and major rail heads. In summary, Roe Highway along with Reid and Tonkin Highways, will join other arterial roads to provide easy access to these... Read more...Last updated: June 30, 1997
The initial proposal by Worsley to develop the Boddington Gold Mine approximately 12km north-west of the town of Boddington was the subject of an EPA evaluation in 1985 (EPA 1985). An Environmental Management Programme was prepared and submitted in 1987 and the mine was commissioned in July 1987. Since that time environmental approvals have been given by the Minister for the Environment for two expansions of throughput, an additional water supply reservoir, the mining of basement and supergene... Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: May 21, 1997
The proposal is to develop five 40ha centre pivot irrigation sites. The five centre pivot sites, in addition to an existing centre pivot site, will result in a total of six centre pivot sites on the property with a total area of 240ha. Only three of the six pivot sites will be used for horticulture at any time. The application for a groundwater licence to irrigate 80 hectares of land (two centre pivot sites) was referred to the EPA by the Water and Rivers Commission on the 29 July 1996 for... Read more...Last updated: May 19, 1997
The proposal is to to expand NufarmCoogee Pty Ltd's Chlor-alkali Plant at Kwinana to allow an increase in chlorine gas production to 42,000 tonnes per annum (tpa) through the installation of a new electrolysis processing circuit. Storage of chlorine held on site will rise from a nominal 50 tonnes to 150 tonnes. Read more...Last updated: March 14, 1997
Main Roads Western Australia proposes to reconstruct the existing two lanes into a four lane carriageway at the Bedfordale Hill section of Albany Highway between the end of the existing dual carriageway and the road train assembly area in the City of Armadale. The earthworks for the proposed carriageway encroach onto Bungendore Park which is part of System 6 Recommendation MSO - Darling Scarp. The proposal also involves the deviation of Neerigen Brook in two locations. Read more...