This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 12, 2018
The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: April 18, 2018
Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: January 24, 2018
The Shire of Denmark proposes to extend the existing quarry and crush limesand within an A Class Parkland and Recreation Reserve vested in the Shire of Denmark. Read more...