This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 21, 1994
Multiplex Constructions Pty Ltd are proposing a major residential development intended to provide some 3,650 residential lots on 495 ha of land located at Egerton, about 20km from Perth in the North East Corridor. Read more...Last updated: November 16, 1994
The Water Authority of Western Australia (WAWA) proposes to construct a service reservoir within the Neerabup Water Supply Reserve 34537 together with associated pipework within the Neerabup Water Supply Reserve 34537 which would be built through Neerabup National Park. Read more...Last updated: October 25, 1994
An alignment for the Perth-Darwin National Highway from Reid Highway to Muchea and a future public transport corridor have been included by the State Planning Commission in a major amendment to the Metropolitan Region Scheme for the North East Metropolitan Corridor (Amendment No. 950/33). The amendment proposes to reserve land necessary to accommodate the future highway and an adjacent public transit corridor. In view of the environmental issues associated with the highway proposal, the... Read more...Last updated: September 2, 1994
Swan Portland Cement Ltd received approval from the Minister for the Environment ( Ministerial Statement 267 , 8 June 1992) to develop the quicklime plant and limestone quarry at Nowergup. This is an inquiry under s46 regarding a request to change the above proposal to increase the production capacity of the quicklime plant from the original 230,000 tonnes/annum to 460,000 tonnes/annum, and to increase the rate of limestone quarrying from the approved 450,000 tonnes/annum to approximately 1,000... Read more...Last updated: August 22, 1994
Since the original environmental statement was published ( Ministerial Statement 84 ), a detailed review of the whole route between middle Swan and the Metropolitan Region Scheme boundary at Wooroloo has been completed. As a result of these studies, Main Roads consider that some sections of the original route need to be changed. In its letter to the Minister for the Environment, Main Roads also indicated that a detailed study of the possible alignment options for the Perth to Adelaide National... Read more...Last updated: August 19, 1994
The Tiwest Joint Venture (TJV), the proponent, proposes to increase the production of finished titanium dioxide pigment at its Kwinana Pigment Plant. The Tiwest Joint Venture has requested changes to Condition 1 of the Ministerial Statement of 26 April 1989, relating to the Pigment Plant. Condition 1 restricts the original plant to 54,000 tonnes per annum of finished titanium dioxide pigment, as assessed by the Environmental Protection Authority in Bulletin 373. The proponent now proposes to... Read more...Last updated: August 4, 1994
Cockburn Cement Limited (the proponent) proposes to dredge 3.7 million tonnes of shell sand from 67ha of Success Bank over a two year period. The area would be dredged using existing plant and equipment. Of the 67ha that is proposed to be dredged, 17ha has substantial seagrass coverage. Read more...Last updated: July 15, 1994
The Canning Property Group proposes to partly develop for residential purposes Lots 122, 123 and 403 Acourt Road, Canning Vale, with the remaining portion being given up for inclusion in the Jandakot Botanic Park. Read more...Last updated: May 28, 1994
Oxleigh Holdings Pty Ltd proposes to develop part of Lot 2 near the corner of Alexander Drive and Gnangara Road Landsdale for residential purposes. A portion of this Lot known as 'Snake Swamp' was identified in recommendation M8 (Wanneroo Wetlands - Eastern Chain) of the Environmental Protection Authority's System Six report, as being valuable for conservation because of its wetland functions. Read more...Last updated: April 18, 1994
This is an inquiry under s46 regarding a proposal to subdivide the northern portion of Lot 121 Illawarra Crescent, Malaga into 45 separate industrial lots. Lots fronting Illawarra Crescent are proposed for showroom/semi-commercial use. IBT's brick and tile manufacturing facility is located on the south side of Lot 121. In the original proposal approved by the Minister for the Environment ( Ministerial Statement 3 , 1 September 1987) the northern portion of the lot was intended to serve as... Read more...Last updated: March 17, 1994
Inquiry under section 46 of the, Environmental Protection Act 1986, to change the conditions for sodium cyanide plant debottlenecking Read more...Last updated: March 8, 1994
The former Gasworks site at East Perth was used for the production of gas from coal between 1922 and 1971. Since decommissioning of the gas plant in 1971, structures have been progressively demolished. The site is now used as a services depot by the State Energy Commission of Western Australia, which is the owner of the site. As a result of past operations, extensive contamination by coal tars, including known carcinogenic and toxic organic chemicals, exists on the site and in adjacent areas of... Read more...Last updated: March 4, 1994
The proponents have written to the Minister for the Environment asking that environmental condition 10 part 3, and procedure 1-1 of Ministerial Statement 288 , which affects land owned by Mt Lawley Pty Ltd, be amended to exclude the Mt Lawley land and allow implementation of the Ellen Brook proposal. Specifically, the proponents have asked that the reference to 450 hectares in the north-west corner of the site, which comprises about 300 hectares of Mount Lawley's land and 150 hectares of... Read more...Last updated: February 1, 1994
The proposal is to develop the site of an old fertilizer works in McCabe Street Mosman Park for residential purposes. The site had been used from 1910 to 1969 primarily as a fertilizer manufacturing works. Since the early seventies the site has not been actively used. The proponents intend to collect all waste and contaminated soils from over the site and place them into a secure underground storage cell to be constructed on the site. Read more...