This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 7, 1996
The main components of the proposal are: a Conservation and Foreshore Reserve of approximately 23.9ha along the Mandurah Channel frontage of the development site; approximately 500 single residential waterside lots (R 15 and R20) established along the margins of 33ha of canal waterways, which will be linked with the existing canal system within the Port Mandurah Stage 1 development and the Mandurah Channel; two areas of communal (group) housing development (R 40) covering 2. 7ha and providing... Read more...Last updated: November 11, 1996
The proposal is to construct a new berth at the eastern end of the Port of Albany, reclaim 5.5ha of Princess Royal Harbour to provide land backing to the new berth, and dredge a basin 6.0ha in extent between the berths and the existing entrance channel to provide sufficient depth of water for ship handling purposes. Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...Last updated: June 28, 1996
The proposal is to improve Albany Port's facility for the mooring of existing port service vessels and for a new large tug. The proposal involves: dredging of approximately 25,000 cubic metres (m 3 ) (1.6 hectares) of material to provide a maximum water depth of -6m CD (Chart Datum); reclamation of 0.4 hectares of PRH using dredge spoil; establishment of a coarse sand beach fronting the reclamation area; construction of a rubble mound breakwater, approximately 250 metres long, using... Read more...Last updated: June 25, 1996
The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...