This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 1, 2021
The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass. Sediment removal will be staged and undertaken via a mobile micro-dredge, or similar unit. The dredged sediment will be pumped to a designated onshore laydown area(s), allowed to dewater with the return water... Read more...Last updated: October 25, 2021
Renergi Pty Ltd propose to build and operate a trial pyrolysis plant in the Shire of Collie. The rial will run for up to 2 years. The proposal involves the treatment of municipal waste and forestry waste via pyrolysis to produce a biochar, condensed bio-oil and wood vinegar. The trial plant is small scale and will be constructed within the boundary of the Collie waste facility operated by the Shire of Collie Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...