This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 12, 2005
The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...Last updated: October 5, 2005
CSBP Limited propose to remediate the former Cresco site in Bayswater. There is up to 280,000 m 3 of contaminated soil present on site. The contamination was caused by the disposal of pyritic wastes or cinders, lead chamber washings, sodium bisulphate, den-scrubber effluent, superphosphate and other building wastes during the site’s history. The cinders, sodium bisulphate and den-scrubber effluent were deposited in excavated pits while the other wastes were disposed of on a more random basis.... Read more...