This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: September 28, 2021
Busselton Jetty Incorporated is proposing to construct and operate an underwater observatory, the Australian Underwater Discovery Centre (AUDC) at the existing Busselton Jetty, Busselton, south-west Australia. The proposal includes the towing of the pre-fabricated AUDC by vessel approximately 100 nautical miles, underwater debris removal, piling activities, installation of the AUDC and installation of a pre-fabricated modular building on the jetty. Piling works associated with the installation... Read more...Last updated: July 13, 2020
The Commonwealth Department of Defence proposes to establish two underwater training ranges (UTR) to facilitate ongoing training of Defence personnel in underwater demolition operations. The key activity during training is the detonation of small volumes (up to 5 kilograms) of explosives. The location of the two proposed UTRs are in Western Australian State waters, currently used as military training exercise areas. One proposed UTR is adjacent to Campbell Barracks, approximately 10km west of... Read more...Last updated: May 11, 2020
The purpose of the proposal aims to continue to catch, tag, relocate and release white sharks to better understand their movements following release. A range of tiger sharks and mako sharks will also be satellite and acoustic tagged as part of this proposal. This proposal is for the continuation of the SMART (Shark Management Alert in Real Time) drumline trial for an additional 12 months (until May 2021). The trial extension will provide additional data to assist in determining the... Read more...Last updated: November 25, 2019
The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...Last updated: June 24, 2019
The Shire of Esperance propose to demolish the heritage listed Esperance Tanker Jetty as it has fallen into disrepair and no longer deemed economically viable for the Shire to maintain. The Shire proposes to build a replacement jetty in close alignment with the old structure and extending 400m of its original 512m length. The old piles of the Tanker Jetty will be retained in-situ at mean sea level for the length of the old structure and three meters below the lowest astronomical tide past the... Read more...Last updated: June 10, 2019
The City of Albany (CoA) proposes to construct an artificial surfing reef (ASR) at Middleton Beach, southern Western Australia. The proposed ASR will be built at the southern end of the beach with the aim of enhancing the recreational surfing conditions for local residents and tourists. The ASR will be designed to target beginner-intermediate surfers. Read more...Last updated: January 17, 2019
The proposal is to undertake a trial of the SMART drumlines as a non-lethal shark hazard mitigation tool in Western Australian conditions. In doing so, it is proposed to catch, tag, relocate and release white sharks. The proposal is located in waters offshore from Gracetown (offshore from Shire of Augusta Margaret River), in the Ngari Capes Marine Park. The duration of the trial will be for 15 months. Where possible, the proposed WA SMART drumline project has been aligned with the NSW SMART... Read more...Last updated: May 14, 2018
Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary Industries... Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: March 7, 2017
The Department of Transport proposes to undertake maintenance and improvement works to the Casuarina Causeway located in Bunbury WA. The proposal includes the refurbishment and realignment of the revetment (including a 0.08 ha increase in the causeway footprint), installation of upgraded services, road works, drainage and landscaping. A multi-purpose building (including ablutions) and fishing/viewing platforms are also included as provisional items. Read more...