This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 27, 2018
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine and the Worsley Alumina Refinery. The new proposal is to extend the current mining area to incorporate adjacent areas; referred to as the Hotham Mining Extension. Additionally, it is proposed to increase the overall production of alumina at the refinery from 4.7 Mtpa to 5.1 Mtpa. The new bauxite mining area is located approximately 8 km west-south-west of the town of Boddington and the alumina refinery is located... Read more...Last updated: October 15, 2018
Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...Last updated: April 9, 2018
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...Last updated: April 4, 2018
Griffin Energy Pty Ltd, proposes to construct and operate the 200MW Bluewaters Power Station on a site located approximately 4km north-east of Collie. It will be a subcritical coal fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters Power Station will supply electricity to customers in the proposed Coolangatta Industrial Estate, or via the South West Interconnected System (SWIS). Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: March 23, 2018
The Bluewaters Power Station Phase I and II proposals were to construct and operate a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts per phase, four kilometres north east of Collie. The previous Minister for Environment requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Bluewaters Power Station proposal, with particular... Read more...Last updated: January 29, 2018
Ray Village Aged Services (Inc) trading as Capecare is proposing to develop a 1.28 ha portion of Armstrong Reserve, Naturaliste Terrace, Dunsborough in order to construct an aged care facility. The proposal will require clearing 9020m2 of native vegetation. The proposed aged care facility will consist of an adult day care centre, independent and supported living accommodation units, administration offices and community facilities including meeting rooms for the CWA. Read more...