This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 29, 2018
The proposal is to undertake a number of redevelopment works to upgrade the existing Two Rocks Marina facilities to address ageing infrastructure, improve safety and provide a foundation for future redevelopment opportunities. This includes the construction of: a reclamation area; breakwater turning and laydown area; and new floating boat pens. Read more...Last updated: December 13, 2017
The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...Last updated: December 13, 2017
The proposal is to extend the Kwinana Freeway 2x2 lane, dual carriageway from Forrest Road to Thomas Road, with major on and off ramps at Russel/Gibbs Roads, Rowley Road, Hope Valley Road and Thomas Road. Provision for upgrading the freeway to a 2x3 lane dual carriageway has been included in the proposal. It has also been proposed to incorporate a dual use path within the freeway reserve, located to the west of the road surface. The alignment of the Forrest Road to Thomas Road section of the... Read more...Last updated: November 20, 2017
Cottesloe Pier Pty Ltd proposes to construct a pier extending off the end of the current Cottesloe groyne. The project design consists of a jetty and boardwalk structure including an underwater observatory, cafe, swimming area and fishing jetty. Read more...Last updated: October 31, 2017
Development of an integrated water supply and wastewater treatment system on Rottnest Island Read more...Last updated: September 18, 2017
The Monkey Mia Dolphin Resort is located within the Shark Bay World Heritage Area, and adjacent to the Monkey Mia Recreation Zone of the Shark Bay Marine Park. The original resort facilities were established around 1985 and therefore not subject to environmental impact assessment under the EP Act, ., In 2002 a proposal to expand the existing resort area and increase the capacity from 600 to 1200 overnight guests, provide staff accommodation facilities, and upgrade the wastewater treatment plant... Read more...Last updated: August 14, 2017
This is the inquiry into a request for changes to Ministerial Statement 709 , relating to the Expansion of the Monkey Mia Dolphin Resort . Read more...Last updated: June 29, 2017
The proposal is for the expansion of the Monkey Mia Dolphin Resort, incorporating both construction and operation. There are three primary components to the proposal: increasing the capacity of the Resort from approximately 600 to 1200 guests per night through an increase from its current area of 3.74 hectares (ha) up to 6.84 ha; developing a new staff accommodation precinct of 2.3 ha immediately to the west of the existing Resort area, incorporating accommodation, recreational facilities and... Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: March 20, 2017
The CSIRO is proposing to construct and operate the SKA-1 Low Frequency Aperture Array. The SKA -1 Low Frequency Aperture Array would be constructed at the SKA Telescope on Boolardy Station approximately 315 km northeast of Geraldton in the Murchison region. The proposal for the SKA – Low Frequency Aperture Array includes a total disturbance of 608 hectares for construction of the Array, access tracks and infrastructure. Read more...Last updated: March 7, 2017
The Department of Transport proposes to undertake maintenance and improvement works to the Casuarina Causeway located in Bunbury WA. The proposal includes the refurbishment and realignment of the revetment (including a 0.08 ha increase in the causeway footprint), installation of upgraded services, road works, drainage and landscaping. A multi-purpose building (including ablutions) and fishing/viewing platforms are also included as provisional items. Read more...Last updated: February 6, 2017
The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale. Read more...Last updated: January 23, 2017
This proposal is to amend conditions of Ministerial Statement 433 relating to dust where these emissions are appropriately regulated through part V of the EP Act. Read more...Last updated: December 15, 2016
The proposal is to operate a regional airport at the Four Mile Hill site. During the assessment of an expansion to the Busselton Regional Aerodrome , the proposal was changed under s.43A of the, Environmental Protection Act 1986, to remove the runway extension, widening and strengthening component. The details of the existing runway are defined in Schedule 1 of Ministerial Statement 901 for this proposal and, as such, a section 45C change to Ministerial Statement 901 has been approved for the... Read more...Last updated: December 13, 2016
The proposal involves the setting of up to 72 baited drum lines off metropolitan and south west coastal regions of Western Australia for a period of three years, beginning on 15 November 2014 and ending on 30 April 2017, after which the program will be subject to review. Drum lines will be set at approximately 1km offshore of popular beaches and surfing spots within two Marine Monitored Areas (MMAs) – the Metropolitan MMA (Ocean Reef to Port Beach) and the South West MMA (Quindalup to Prevelly... Read more...Last updated: December 8, 2016
The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...Last updated: December 8, 2016
In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing... Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...