This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 8, 1990
The proposal is to develop the Tubridgi Gas Field to supply natural gas to the existing Dampier to Perth pipeline. This would require the establishment of processing facilities on site near Onslow and an 85 kilometre connecting pipe to join into the main line. The gas field is about 36 square kilometres in area and lies under Urala Station pastoral lease, about 25 km south-west of the town of Onslow. It is estimated that up to 30 terajoules of gas per day could be collected over a field life of... Read more...Last updated: September 10, 1990
The proposal is to provide reticulated gas to the public in the Mandurah area using standard air/gas mixing and storage facilities at SECWA's site in Gordon Road, Mandurah. The plant will provide an initial gas reticulation system to allow a customer base to be established. Further planning is to provide a connection to the Perth-Bunbury natural gas pipeline when the customer base is large enough to warrant the capital investment. The plant is similar to one operating in Albany... Read more...