This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 1, 1988
Worsley Alumina has submitted a proposal to upgrade the existing Boddington Gold Mine facilities by increasing the maximum daily process plant throughput from 12,000 tonnes per day to 16,000 tonnes per day Read more...Last updated: June 3, 1988
The proposal is to develop a project which would reprocess old gold tailing dumps located in the Golden Mile, Kalgoorlie. Anglo American Pacific Limited plans to treat 32.5 million tonnes which may increase to 57 million tonnes if additional dumps are incorporated. The project would mine the old tailings dumps using high pressure water jets from monitor guns. The slurry of tailings would be pumped from the monitor station to the plant site, and then passed through a carbon-leach/carbon in pulp... Read more...Last updated: May 23, 1988
The proposal is to construct and operate a new concentrate roasting facility 17 km north north-west of the Kalgoorlie Town Centre. The proposed roaster would be required to treat approximately 190 000 tonnes per annum of concentrate. This would result in the production of 16 000 kg/hr of sulphur dioxide. A concentrate containing typically 27% iron, 33% sulphur and 35 gram per tonne of gold, would be piped as a slurry to the roaster from the proposed Fimiston Plant. The slurry would then be fed... Read more...Last updated: February 25, 1988
The proposal is to establish a gold mining operation of up to 2 million tonnes per annum with a project life of 4-5 years. The mine is proposed to be located in State Forest, with processing and waste disposal facilities located on private land. The mine would be adjacent to the currently operating Boddington Gold Mines, and would mine the same ore body. The proposed mine is located in the eastern, low rainfall. section of the Darling Range and also within the catchment area of the 34 Mile... Read more...Last updated: February 15, 1988
The proposal is to upgrade the existing Mine facilities by increasing the maximum daily process from 8 000 tonnes to 12 000 tonnes. Ore would continue to be mined from the same orebody currently being mined. It is therefore expected that the proposed increases in the rate of production would shorten the overall project life from fifteen to possibly ten years. The plant facilities required for the upgrading would be an additional crusher, a ball or semi-autogenous grinding mill, additional... Read more...